Water Intake Structure


The Water Intake Structure (WIS) is a critical component of the overall reservoir project, and will essentially convey raw or untreated water from the reservoir to the future Water Treatment Facility.  The Water Intake Structure is a reinforced concrete tower, approximately 74 feet tall at completion, that will be constructed within the reservoir pool.  This structure also includes two 72-inch inlet pipes that will extend out into the reservoir, to collect and convey raw water to the future Water Treatment Facility.  The Water Intake Structure includes control gates which will allow operators to pull water from various levels within the reservoir based on water quality and seasonal conditions.  The WIS will also include a series of pumps that will convey the raw or untreated water to the future Water Treatment Facility.  Construction is underway with a scheduled completion date of August 2014.     

  • Img 0082
  • G0014636
  • Wis2
  • Wis1
  • Wis4 15
  • Wis%204%20%2015
  • Wis%20d%204 15
  • Wis%204 15
  • Wis%203 15
  • Wis%20feb%2015
  • Wis%20jan%2015
  • Wis%20nov%2014
  • Img 0142b
  • Dscn5593
  • Dscn5507
  • Dscn5575
  • Dscn5514
  • Dscn5273
  • Dscn5072
  • Img 0151c
  • Dscn4994
  • Dscn4988
  • Dscn4980
  • Dscn4976
  • Picture31
  • Picture30
  • Picture29
  • Img 7763
  • Dscn2218
  • Dscn1769
  • Dscn1739
  • Dscn1707
  • Dscn1614
  • Dscn1456
  • Dscn1184
  • Img 0297